3for2@UWC Singapore
Demonstrator of /
3for2 – Beyond Efficiency
Construction /
2015
Funding /
Siemens Building Technologies
Key Partners /
United World College South East Asia
TROX Technik GmbH
Selected Publications /
1 / A. Rysanek, P. Murray, J. Pantelic, F. Meggers, M. Mast, A. Schlueter. “The Design of a Decentralized Ventilation System for an Office in Singapore: Key Findings for Future Research,” Proceedings of CISBAT 2015. Lausanne, Switzerland, 2015, 77-82. Research Collection
A first-time implementation of our 3for2 concept was realised on the campus of the United World College in Singapore. Comparing 3for2 to a standard “green building” in Singapore, our concept provides 20% additional office space, reduces energy consumption by 40% and requires 16% less construction materials.
Building systems energy concept @ UWC Singapore

UWC Singapore rendering
Office level dashboard

Energy constumption dashboard

Interior cross section

Open space office